structural / design / reinforced concrete

RC beam section checks: bending, shear and torsion.

Set the reinforcement layers beside the live section sketch. Choose Eurocode concrete or the bounded SDMHR material and compression-block profile, then inspect the displayed section comparisons. Neither option establishes complete beam or bridge design.

Design basis must be confirmed

The Eurocode option uses first-generation EN 1992-1-1:2004 + AC:2010 + A1:2014. The SDMHR option applies verified material, compression-block and strut-angle modifications from the December 2025 Highways manual; remaining EN section calculations are comparisons, not verified bridge design. Confirm the applicable standards, National Annexes, design situation and project assumptions.

declared calculation basis

Layered reinforcement, ULS and SLS in one calculation.

The model is a rectangular, normal-weight-concrete section with high-bond reinforcement under sagging bending. Choose a single or double reinforced flexural section, then add up to twelve tension layers and five compression layers. Each layer has a count and diameter; each additional layer has its own editable vertical clear gap. Bars are evenly distributed over a common usable width inside the provided outer link, or inside the main-bar cover when that link is omitted, so equal-count rows align. The tool derives area, centroid, effective depth and a basic entered-layer fit check. A separate longitudinal torsion-bar schedule is not required as an input; longitudinal torsion demand is calculated for independent provision and detailing verification.

Reading the spacing: horizontal spacing is calculated, not an extra input. The sketch and layer readouts show both centre-to-centre spacing and clear distance between bar surfaces. For equal-diameter bars, horizontal clear distance equals centre spacing minus the bar diameter. Vertical centre spacing equals the entered clear gap plus half of each adjacent layer's diameter. The §8.2 screen checks horizontal and vertical clear gaps against max(φ, aggregate size + 5 mm, 20 mm), using the larger diameter for unequal bars and recommended spacing coefficients k1 = 1, k2 = 5 mm. Confirm the project National Annex. A crowded or colliding arrangement is flagged for review; it is not silently staggered. Spacing also feeds the applicable SLS crack-spacing branch—it should not be ignored merely because bending area is unchanged.

Parameter input guide

  • Section: b is the overall rectangular width and h is the full concrete depth, in mm. Nominal cover is measured from the surface of the reinforcement nearest the concrete face to that concrete surface. This includes links where present; without an outer link, the entered cover is to the nearest main-bar surface, not its centre. Each additional layer gap is clear distance between bar surfaces.
  • Concrete cover: determine the required cover separately using the EN 1992-1-1 §4.4.1 cover helper ↗ or the Hong Kong SDMHR Table 5.2 cover helper ↗. Both open in a new tab. They are separate methods: SDMHR nominal table values already include the stated 10 mm deviation allowance. Confirm bond, durability, fire and construction requirements before entering the governing nominal cover here.
  • Calculation basis and materials: for ordinary Eurocode, enter characteristic cylinder fck, limited here to C20/25–C50/60, and confirm the project National Annex. For SDMHR, select characteristic cube fck,cube from 30–60 MPa. Cylinder strength, mean tensile strength and short-term modulus are then read from SDMHR Table 5.1, not inferred using a fixed cube/cylinder ratio. The selected profile changes the compression block and fixes cot θ = 1; it is not just a strength-label change. Switching basis resets the displayed material defaults and partial factors; review them before recalculating.
  • Reinforcement: 4T20 means four 20 mm longitudinal bars. Outer T10 @ 125 mm means a closed 10 mm link with two vertical legs at 125 mm pitch. The outer link is provided by default, but an explicit omission option is available. Use Add stirrup to add each additional two-leg internal stirrup separately, with its own diameter and spacing. Remove last stirrup removes one row; no rows means none. Each row is a repeated schedule along the beam, not an isolated member-wide location. The ten-stirrup entry limit is a CivilKits interface limit, not a code maximum. Compression bars count toward bending only in double reinforced mode. Required longitudinal torsion steel must be included and independently allocated within the ordinary cage, including corners and side faces; closed links alone do not supply it.
  • Omitting the outer link: low shear alone does not demonstrate that an ordinary beam may omit minimum shear reinforcement. The Eurocode option permits a conditional concrete-shear comparison for independently verified slab redistribution or qualifying minor-member exceptions, with zero torsion. Applicability must be checked in the licensed standard and project National Annex. An omitted-link arrangement receives no complete bending or overall pass because the longitudinal shifted moment envelope, anchorage and restraint are not verified. Internal stirrups without an outer link do not establish a verified station layout or torsion cage. No SDMHR omission permission is inferred from those Eurocode member declarations.
  • ULS actions: MEd, VEd and TEd are concurrent factored effects for one member and one section. No hidden division of shear by two is applied. Axial force, hogging orientation and load combinations are not calculated. With nonzero torsion, bending resistance is labelled bending/shear-only and combined longitudinal allocation is not verified.
  • SLS actions: the Eurocode flexural comparison takes separate quasi-permanent and characteristic sagging moments from EN 1990 combinations. For this same section they must satisfy MEd ≥ Mcharacteristic ≥ Mquasi-permanent. These checks exclude service shear/torsion. In SDMHR mode, the displayed EN flexural results do not establish the bridge-specific crack verification combinations or thermal checks; verify the SDMHR/EN 1992-2 serviceability basis separately.
  • Cracking: choose wmax for exposure, project requirements and the applicable basis. The Eurocode reference is §7.3.1, Table 7.1N; the separate SDMHR cover helper displays the corresponding Table 5.2 crack-width value. Supply concrete tensile strength at cracking, modulus, creep and load duration. High-bond bars in bending are assumed; restraint/thermal effects are not included.
  • Deflection: choose effective span and support factor K (Table 7.4N). This is the EN 1992-1-1 §7.4.2 L/d deemed-to-satisfy screen, not a deflection in mm. It is not verified as an SDMHR bridge-deflection check. Use the governing project analysis where the screen's conditions are not met.

SDMHR material-profile example

Select the SDMHR profile and 40 MPa cube concrete. Table 5.1 gives cylinder fck = 32 MPa, fctm = 2.3 MPa and Ecm = 25,100 MPa. With the displayed γc = 1.5, the Figures 5.2/5.3 design stress is fcd = 0.67 × 40 / 1.5 = 17.867 MPa, and the rectangular-block depth is λx = 0.9x. The shear/torsion strut angle is θ = 45°, so cot θ = 1. These values demonstrate the implemented profile, not completion of the additional bridge checks.

Flexure and shear

The Eurocode calculation solves force equilibrium under §6.1 with layer-by-layer strain compatibility, the §3.1.7 rectangular compression block and elastic–perfectly plastic steel. Compression steel stress is computed, not assumed to yield. It reports required bending-only reinforcement and reserves the additional shear-induced longitudinal steel under §6.2.3(7), Eq. 6.18 for vertical links. That truss reserve does not verify the no-link longitudinal force envelope. Concrete shear, shear reinforcement and strut resistance use §§6.2.2–6.2.3; minimum reinforcement and basic spacing screens use §9.2. The SDMHR profile substitutes the verified material values and Figures 5.2/5.3 block in the force-equilibrium model, with the angle prescribed by §§5.7.8–5.7.9. Remaining EN checks are explicitly comparative. The detailed report identifies each equation's applicable reference or derived method.

Torsion and combined shear–torsion

Torsion uses the equivalent thin-walled closed-section model. Required total transverse steel is the shear requirement plus twice the torsion requirement per closed-link leg. Supplied steel is the outer closed-link area per pitch plus the sum from additional internal shear sets. The outer link must independently carry its torsion allocation; only its remaining capacity is credited to shear. Extra internal legs are not credited as an outer torsion cage, even if the total supplied area is large. The concrete-strut shear/torsion interaction is checked separately.

The report calculates required longitudinal torsion area using Eq. 6.28 and gives each wall's demand. This area must be incorporated in ordinary longitudinal reinforcement and checked for distribution, corners and concurrent bending/shear (§§6.3.2 and 9.2.3). The layer-only inputs do not capture a complete four-face cage, so a nonzero torsion case is explicitly marked longitudinal detailing not verified, with no complete torsion or combined bending/torsion pass. Closed stirrups do not replace longitudinal reinforcement.

Additional stirrup count: the report shows the shear-area shortfall after reserving torsion in the outer link, then a total equivalent number of two-leg stirrups at the first added stirrup's diameter and pitch, if that were the only supplementary schedule. When none is entered, the strength-only estimate explicitly uses the example T10 @ 125 mm; it does not add any stirrup to the provided arrangement. It is not a count to add on top of stirrups already entered. This is a strength-only estimate, not an automatically approved detail. The sum of area/pitch is a longitudinal average. For the declared station model and transverse leg-spacing checks, supplementary pitches must divide the outer pitch and share a common starting point. Other mixed pitches remain calculable as an average but are marked station layout not verified, with no shear or overall pass. This is a CivilKits modelling limit, not a claim that other schedules are prohibited by the code. Internal legs are assumed evenly distributed; verify the actual link bends, anchorage, bar fit, station alignment and member-wide force envelope separately.

SLS: crack width, stresses and deflection

The EN flexural crack calculation uses a transformed cracked section and §7.3.4, Eqs. 7.8, 7.9, 7.11 and 7.14. The report shows effective tension area, steel stress, mean strain difference, crack spacing and wk. Separate characteristic and quasi-permanent stress limits are screened under §7.2. The §7.4.2 deflection screen shows required-steel ratio, support factor and modifiers. An unsupported cage or service condition is marked not checked, never passed. SDMHR mode uses its Table 5.1 material values in the displayed comparisons, but does not verify complete SDMHR bridge SLS or treat the building L/d screen as a bridge-deflection check.

What this calculator does not establish

  • This is not complete member design or evidence that a beam is safe or code-compliant.
  • No load combinations, actual displacement/curvature integration, anchorage/laps, full reinforcement detailing, durability, fire, fatigue, seismic, bearing, construction-stage or support-region checks are performed. The separate cover helpers do not make these RC section checks a complete durability or fire design.
  • Axial force, biaxial bending, prestressing, flanges, discontinuity regions, thermal/restraint cracking and service shear/torsion are outside this rectangular sagging-bending model.
  • The crack model requires an assessable effective tension zone. Layers outside its simplified scope are explicitly flagged rather than given a false pass.
  • The SDMHR option implements only the stated material table, compression block, partial-factor bounds and 45° strut angle for cube grades 30–60 MPa. It does not verify all EN 1992-2, UK National Annex, PD 6687 or SDMHR bridge requirements, and therefore provides no complete SDMHR design pass.
  • The governing project standards, National Annexes and licensed publications remain controlling. Confirm conditional reinforcement-omission provisions and no-link longitudinal detailing independently.

Engineering disclaimer

For learning and preliminary checking only. Do not rely on these results alone for construction, statutory submission, certification or safety decisions. A qualified engineer must independently verify inputs, equations, combinations, code editions and every governing check. Content and software may contain errors or omissions; no guarantee of completeness or fitness for a project is given.

Read the terms and full disclaimer. A disclaimer does not itself guarantee immunity from liability.

official sources

Check the applicable national publication.

Use the applicable edition of EN 1992-1-1 with its National Annex. References beside each equation identify the declared first-generation edition or the derived/model method; they do not reproduce standard text. For publicly available worked examples, see the European Commission JRC building-design examples. The §8.2 minimum-clear-spacing screen and recommended coefficients can also be checked against the JRC reinforcement-detailing workshop, slide 3. The Concrete Centre EC2 worked examples illustrate the additional shear-induced tension expression in Eq. 6.18. The span/depth guidance cap follows the Concrete Centre concise EC2 guide. These Concrete Centre examples use UK guidance; confirm it against your project National Annex.

For the separate Highways profile, use the Highways Department Structures Design Manual for Highways and Railways, 2013 Edition, December 2025 revision. The implemented profile references Table 5.1 for material properties, Figures 5.2/5.3 for the compression block, §5.7.1 for material partial factors and §§5.7.8–5.7.9 for the shear/torsion strut angle. The separate cover helper follows §5.4.2 and Table 5.2. SDMHR's wider basis includes EN 1992-2, UK National Annexes and PD 6687; that complete bridge-design basis has not been implemented here.